Projects at Your School

An overview of proposed bond projects in the district.

Alder Elementary

Built in 1965

Repair

  • Water heater replacement
  • Rooftop HVAC replacement
  • Updated building system controls
  • Updates to community meeting spaces

Secure

  • Full PA system replacement
  • ADA upgrades:
    • Accessible parking spaces
    • Sidewalk repairs

Davis Elementary

Built in 1959

Repair

  • New covered play structure
  • Roof repairs
  • Rooftop HVAC replacement
  • Water heater replacement
  • Updated building system controls
  • Electrical panel replacement
  • Updates to community meeting spaces

Secure

  • New fire alarm system
  • Full PA system replacement
  • ADA Upgrades:
    • Accessible parking spaces
    • Sidewalk repairs
    • Additional ramps in parking lot

Glenfair Elementary

Built in 1954

Replace

  • Replace the 72-year-old Glenfair elementary school with a modern, safe new school.
  • The aging building has mechanical systems that are at the end of their usable life and wide-scale infrastructure repairs are required throughout the school campus.
  • The current school building has limited space for dedicated school programs as well as space for community partners and programs.

Hartley Elementary

Built in 1963

Repair

  • Roof replacement
  • Rooftop HVAC replacement
  • Cafeteria wall repairs
  • Water heater replacement
  • Updated building system controls
  • Updates to community meeting spaces

Secure

  • New fire alarm system
  • Additional perimeter fencing 
  • ADA Upgrades:
    • Sidewalk repairs
    • Replace exterior stairs/ramp

Margaret Scott Elementary

Built in 1961

Repair

  • Full PA system replacement
  • Roof recoat
  • Rooftop HVAC replacement
  • Water heater replacement
  • Updated building system controls
  • Replace exterior classroom doors
  • Updates to community meeting spaces

Secure

  • ADA Upgrades:
    • Sidewalk repairs
    • Replace exterior stairs/ramp

Salish Ponds Elementary

Built in 2003

Repair

  • Full PA system replacement
  • Roof recoat
  • Rooftop HVAC replacement
  • Water heater replacement
  • Updated building system controls
  • Boiler replacement
  • Updates to community meeting spaces

Secure

  • New fire alarm system
  • ADA Upgrades:
    • Accessible parking spaces
    • Sidewalk repairs

Sweetbriar Elementary

Built in 1974

Repair

  • New gym floor
  • Roof recoat
  • Rooftop HVAC replacement
  • Gym floor resurfacing
  • Water heater replacement
  • Updated building system controls
  • Boiler replacement
  • Updates to community meeting spaces

Secure

  • New fire alarm system
  • Full PA system replacement
  • Security fencing
  • New door hardware
  • ADA Upgrades:
    • Sidewalk repairs

Woodland Elementary

Built in 1997

Repair

  • Roof recoat
  • Rooftop HVAC replacement
  • Water heater replacement
  • Updated building system controls
  • Boiler replacement
  • Updates to community meeting spaces

Secure

  • New fire alarm system
  • Full PA system replacement
  • ADA Upgrades:
    • Repair/replace sidewalks

H.B. Lee Middle School

Built in 1966

Repair

  • Restroom upgrades
  • Full PA system replacement
  • Roof recoat
  • Water pipe and water heater replacement
  • Plumbing fixture replacement
  • Rooftop HVAC replacement
  • Updated building system controls
  • Boiler replacement
  • Updates to community meeting spaces

Secure

  • ADA Upgrades:
    • Accessible parking spaces
    • Sidewalk repairs
    • New ADA ramps in parking lot

Walt Morey Middle School

Built in 1997

Repair

  • Roof recoat
  • Rooftop HVAC replacement
  • Water heater replacement
  • Updated building system controls
  • Boiler replacement
  • Updates to community meeting spaces

Secure

  • New fire alarm system
  • Full PA system replacement
  • ADA Upgrades:
    • Concrete repairs

Reynolds Middle School

Built in 1956

Repair

  • New roof
  • Restroom upgrades
  • Water heater replacement
  • Plumbing fixture replacement
  • North vestibule replacement
  • Window replacement
  • Rooftop HVAC replacement
  • Updated building system controls
  • Electrical panel replacement
  • Updates to community meeting spaces

Secure

  • New fire alarm system
  • Full PA system replacement
  • ADA Upgrades:
    • Sidewalk repairs
    • New exterior ADA ramps

Reynolds High School

Built in 1976

Repair

  • Restroom upgrades
  • Water heater replacement
  • Plumbing fixture replacement
  • New boiler
  • Rooftop HVAC replacement
  • Updated building system controls
  • Updates to community meeting spaces
  • Athletics updates:
    • New turf field
    • New bleachers
    • Relocation of field lights, softball dugouts and track shed

Secure

  • New fire alarm system
  • Full PA system replacement
  • ADA Upgrades:
    • Accessible paths to parking lots and to fields
    • Sidewalk repairs
    • Parking lot surface repairs

Reynolds Learning Academy

Built in 2003

Repair

  • Water heater replacement
  • New boiler
  • Rooftop HVAC replacement
  • Updated building system controls

Secure

  • New fire alarm system
  • Full PA system replacement
  • ADA Upgrades:
    • Sidewalk repairs
    • ADA restrooms

Newer Schools in the District

The following schools in the Reynolds School District will not receive bond funds:

Fairview Elementary

Built in 2018

Troutdale Elementary

Built in 2018

Wilkes Elementary

Built in 2018

The Proposed 2026 Reynolds School Bond

Translate »